{"id":60221,"date":"2026-05-06T22:59:24","date_gmt":"2026-05-07T01:59:24","guid":{"rendered":"https:\/\/service.codeus.ca\/index.php\/2026\/05\/06\/intensifican-obras-de-drenaje-en-el-distrito-3-de-montero\/"},"modified":"2026-05-06T22:59:24","modified_gmt":"2026-05-07T01:59:24","slug":"intensifican-obras-de-drenaje-en-el-distrito-3-de-montero","status":"publish","type":"post","link":"https:\/\/service.codeus.ca\/index.php\/2026\/05\/06\/intensifican-obras-de-drenaje-en-el-distrito-3-de-montero\/","title":{"rendered":"Intensifican obras de drenaje en el distrito 3 de Montero"},"content":{"rendered":"<p>       El alcalde de Montero, Regys Medina, inspeccion\u00f3 la instalaci\u00f3n de 23 tubos de drenaje en el barrio Santa B\u00e1rbara 1 (Distrito 3), como parte de un plan preventivo para evitar inundaciones y mejorar la calidad de vida de los vecinos. La obra se ejecut\u00f3 en la avenida Las Lagunas, v\u00eda que conecta con la avenida Azuzaqu\u00ed.<\/p>\n<p>    La intervenci\u00f3n busca optimizar el flujo de aguas pluviales y prevenir desbordes hacia las viviendas durante la temporada de lluvias. \u201cEstamos realizando un trabajo preventivo para evitar que estas zonas se inunden\u201d, afirm\u00f3 la autoridad, destacando que los trabajos permitir\u00e1n restablecer la transitabilidad vehicular y peatonal.<\/p>\n<p>    Paralelamente se realiza el perfilado de calles y mantenimiento de canales de desag\u00fce. Durante la inspecci\u00f3n, los vecinos expresaron su agradecimiento por la obra, mientras el alcalde reafirm\u00f3 su compromiso de priorizar acciones con impacto directo y duradero en los distritos.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>El alcalde de Montero, Regys Medina, inspeccion\u00f3 la instalaci\u00f3n de 23 tubos de drenaje en el barrio Santa B\u00e1rbara 1 (Distrito 3), como parte de un plan preventivo para evitar inundaciones y mejorar la calidad de vida de los vecinos. La obra se ejecut\u00f3 en la avenida Las Lagunas, v\u00eda que conecta con la avenida [&hellip;]<\/p>\n","protected":false},"author":50,"featured_media":60222,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[525,1379,771,15629,15630,3216,4085,5564],"tags":[],"class_list":["post-60221","post","type-post","status-publish","format-standard","has-post-thumbnail","category-bolivia","category-canales","category-comunidad","category-drenaje","category-instalacion","category-lluvias","category-montero","category-prevencion"],"_links":{"self":[{"href":"https:\/\/service.codeus.ca\/index.php\/wp-json\/wp\/v2\/posts\/60221","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/service.codeus.ca\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/service.codeus.ca\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/service.codeus.ca\/index.php\/wp-json\/wp\/v2\/users\/50"}],"replies":[{"embeddable":true,"href":"https:\/\/service.codeus.ca\/index.php\/wp-json\/wp\/v2\/comments?post=60221"}],"version-history":[{"count":0,"href":"https:\/\/service.codeus.ca\/index.php\/wp-json\/wp\/v2\/posts\/60221\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/service.codeus.ca\/index.php\/wp-json\/wp\/v2\/media\/60222"}],"wp:attachment":[{"href":"https:\/\/service.codeus.ca\/index.php\/wp-json\/wp\/v2\/media?parent=60221"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/service.codeus.ca\/index.php\/wp-json\/wp\/v2\/categories?post=60221"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/service.codeus.ca\/index.php\/wp-json\/wp\/v2\/tags?post=60221"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}